SOUTH CAMBRIDGE | roof cladding

Our client required a watertight solution for a 7500 sqft industrial unit in South Cambridge to prepare for winter. Ensuring the production area remained operational throughout the process was a critical requirement that we were tasked with.

Industrial Units

Project Location

South Cambridge

Project Length

4 Weeks

Client Brief, the project

 

Shakery Group completed the over-cladding of this industrial unit, addressing the client’s need for a durable, weatherproof solution. Over-cladding was chosen as the most effective method, allowing us to upgrade the roof while keeping the production area fully operational.

In addition to securing the roof against winter conditions, we replaced all windows and the front entrance door. These updates significantly improved the building’s energy performance, contributing to a more sustainable and cost-efficient operation for our client.

 

Throughout the project, our team worked with precision and care to minimise disruption to the client’s day-to-day activities. The result is a fully upgraded, energy-efficient space that meets both functional and aesthetic needs.

Consult with Our Team: Your Next Project Begins Here

Contact us at Shakery to discuss how we can collaborate on bringing your project to life with creativity and precision.

Call us on: 01376 617530

Email us on: enquiries@shakery.co.uk